gavelCalifornia architects can breathe a little easier. Filed June 3, 2013, the Court of Appeals decision in Brisbane Lodging, LP v. Webcor Builders, Inc. held that the section 13.7.1.1 of the 1997 AIA Standard Form of Agreement between Owner and Contractor is enforceable.

This is good news for Design Professionals, as section 13.7.1.1 shortens the statute of limitations period to four years and effectively abrogates the delayed discovery rule in California.

Per an announcement email recently received from Jacqueline Pons-Bunney, a partner at law firm Weil & Drage:

The case involves a contract between an owner and a contractor for the construction of a hotel. The clause at issue reads:

“any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion.”

Substantial completion at the subject project was July 31, 2000. In early 2005, the owner discovered a break in the sewer line which caused waste to flow under the hotel. It was determined that the plumbing problem was a latent defect. Both the contractor and its plumbing subcontractor investigated the problem and attempted repairs. It was ultimately discovered that the plumbing subcontractor had installed ABS pipe rather than cast iron pipe for the sewer line, in violation of the Uniform Plumbing Code. The owner filed a lawsuit in May 2008. Continue reading “California Court Upholds Contractual Statute of Limitations Provision in AIA Standard Form”

pronet_rmcrgAt its most basic level, risk management for design firms includes selecting and signing sound contracts. a/e ProNet’s  Risk Management & Contract Guide for Design Professionals (2005) can assist with the specifics of this process.

An excerpt from Chapter 7, Some Do’s and Don’ts of Contract Language:

7.2 Words to Avoid

Certain words create the impression that the design firm has a greater duty or responsibility than required by the generally accepted standard of care and scope of services stated elsewhere in the contract. Some words that risk managers often advise the design firm to avoid using in their contracts to the greatest extent possible include the following:

  • “supervise contractor’s work”
  • “control contractor’s work”
  • “direct contractor’s work”
  • “guarantee or warrant either your services or the contractor’s work”
  • “certify that contractor’s work meets the plans and specifications”
  • “inspect contractor’s work to assure it meets the plans and specifications”

This risk management guide was previously out of print, but has since been re-released in electronic format. The book includes three updated optional AIA-approved continuing education courses! Visit the a/e ProNet Web Store to purchase and download your copy today! Also available is our most recent guide, Risk Management for Design Professionals in a World of Change (2009). If you have any questions about these resources, find your local a/e ProNet broker or Contact Us.

ooh_moon

Now that we have grabbed your undivided attention, the purpose of this article is to alert Design Professionals to an alarming trend. This trend involves the inclusion of contract provisions in agreements prepared by Owners/Developers and their attorneys that force a Design Professional to work for free in the event that the Owner/Developer unilaterally determines that there is a “dispute.”

Overview

It goes without saying that every contract, especially in the design field, must be read thoroughly before it is signed, or the signer will be stuck with the ramifications. Generally speaking, the clauses in question here state that in the event of any dispute between the Owner/Developer and Design Professional, the Owner/Developer may withhold payment until the dispute is resolved, but the Design Professional must continue to perform services. This upsets the historical balance of power between the Owner/Developer and the Design Professional and creates a situation where the Design Professional may very well end up working for free or else be faced with being sued if they stop work or suspend services. Continue reading “How to Get a Design Professional to Work For Free!”

ProNetworkNews_2013MarchThe March 2013 issue of ProNetwork News is the second installment of a two-part article; the author, Tim Corbett of SmartRisk explains the origins and principles of project coverage and introduces the reader to two of the four main types of Project Insurance. For a recap of the first part, including details about types 1 (Project Professional Liability Insurance) and 2 (IPD Project Specific Insurance), download the full March issue, or, better yet, download the February 2013 newsletter here.

Now, let’s examine the remaining three types of project coverage.

3. Project Specific Insurance Limits

Sometimes, contracts demand that design professionals carry a higher limit than they usually do. This can occur on any kind of project, but is more common on larger, higher risk projects, and more recently, on public ones. One of the more common strategies for obtaining increased limits for a project is through a Project Specific Insurance Limit. This is provided by endorsement through your current practice policy insurance carrier.

Benefits and typical features of Project Specific Insurance Limits:

  • Provides a higher limit for the firm, for a specific project only.
  • Can be more cost effective than raising the limits on the entire practice policy.
  • Makes the cost of the project-specific limit a reimbursable expense.

Cautionary Points and Tactics:

Having a project specific increased limit may not always be the best strategy, and it may not even be available from your practice policy carrier. From an insurance company’s perspective, comparing construction costs to policy limits is part of the underwriting process. Construction value and requested limits may not be in line with the insurer’s potential exposure: those higher limits requested could place a target on the design firm’s back. The insurer doesn’t want to provide the higher limits that could be used as a cost recovery strategy.

  • Ensure that requested limits are in line with exposures and construction costs. For example, is it necessary to require a $5 million limit of professional liability insurance from a firm performing services on a $20 million project?
  • Contact the contract administrator, and state that your firm normally carries a lower professional liability limit than requested, and that it is consistent with industry practice. Inquire if your current limit will be acceptable.

* Include language similar to the following in your contract:

“The expense of any additional insurance coverage or limits requested by the Owner in excess of that normally carried by the firm shall be a reimbursable expense paid by the Owner.”

To find out more about types 4 (The Wrap-Up Policy) and 5 (Owner Protective Insurance Policy or OPIP), download the full March 2013 issue from our website.

About the Author: Timothy (Tim) Corbett is Founder and President of SmartRisk, a Pasadena, CA based consultancy with over 25 years of experience providing risk management and performance management solutions to Design and Building Professionals. Mr. Corbett holds a BS Degree in Security & Risk Management, MS Degree in Management; a degree in Environmental studies as well as concentrated studies in Architecture Design and is LEED accredited. For more information on this or other topics, visit the SmartRisk website or email Tim at tcorbett@smartrisk.biz.

Photo via Victor O. Schinnerer's War Stories: Budget Buster
Photo via Victor O. Schinnerer’s War Stories: Budget Buster

I shouldn’t need to buy  insurance! I’ve never had a claim.

This is a common refrain from architects and engineers purchasing professional liability insurance for the first time. We hear you. There are lots of design professionals who feel this way. That’s why it’s important to recognize that insurance isn’t about punishing you for past claims; it’s about protecting you from future claims. Contractual insurance requirements aren’t merely expensive obstacles to bidding for a job; they’re supposed to protect the individual parties from the far more expensive burden of an uninsured professional liability claim. And, like it or not, industries like Architecture and Engineering are rife with potential claims.

Oh yeah? Like what?

Don’t just take our word for it. Check out this library of War Stories and Claims Scenarios from Architects, Engineers, Surveyors & Consultants, an excellent resource offered by Victor O. Schinnerer, one of the leading Professional Liability insurance companies. These are real life claims stories. Here you can read through scenarios which happened to other firms, often in spite of their best efforts to avoid such things! While the names have been changed, details are included. In each case, you’ll find out what the mistake was. How it was made. How much it ultimately cost. How it could have been avoided.

A couple of examples from the War Stories library:

Budget Buster

ABC Engineers provided design services for a residential project. The owner obtained a construction loan from a bank for $2.7 million; believing he could obtain additional funds from the bank if needed. As construction progressed, they expended the $2.7 million budget before the project was complete. The bank believed $2.7 million was adequate to complete the project and denied the owner’s request for an additional $1.3 million. The owner could not obtain additional funds and the contractors stopped working, leaving the project incomplete. Read more at Schinnerer’s website…

Due Diligence is Due

Gerard Coins Architecture, a sole proprietor, was retained by a housing authority to provide architectural design for Blanket Apartments, a low income housing development. Gerard Coins Architecture also provided mechanical design, which was permitted by state law. The architect’s design called for standard, 30 gallon water heaters but the owner wanted electric, tankless water heaters instead. The architect checked with a supplier and based on verbal information, sized the water heaters for the apartment units.

After the apartments were built, it was discovered that the water heaters did not supply enough hot water. The architect contacted the water heater manufacturer who told him the water heaters were intended to be used at a source, such as a sink or bathtub—not to heat the water for an entire apartment. Read more at Schinnerer’s website…

Risky Inspection

Homer Watkins Engineering, a civil engineering firm, was retained to provide a limited inspection and design report for a historic building. Several years later, they provided an inspection report for the sale of the same building.

A painting contractor employee, who was working on the historic building, fell three stories sustaining serious injuries after the railing collapsed on a balcony he leaned against. The painting contractor employee filed suit claiming he was permanently, partially disabled and disfigured. After filing suit against a number of parties, Homer Watkins Engineering’s inspection report was found during discovery and the suit was amended to add them.

The painting contractor employee contended that while Homer Watkins Engineering’s inspection report put the new owner on notice that the railing was too low and posed a safety hazard, it did not go far enough in warning the owner that it should be fixed immediately. While it was felt the height of the railing had nothing to do with the fall, the defense counsel felt the inspection report should have been more detailed as it was dealing with a very old brick and wood building that may have had weaknesses requiring more investigation. Read more at Schinnerer’s website…

Protect yourself and your firm from situations like these by purchasing a Professional Liability policy tailored to the specific needs of design professionals. Our members are specialists in this field, so find and contact your local a/e ProNet broker today.

We wanted our 100th post here at The ProNet Blog to be something special! So, we decided to use it to give a much deserved shout-out to the a/e ProNet clients who were recently recognized by the AIA Committee on the Environment (COTE).

According to the ArchDaily blog:

“The COTE Top Ten Green Projects program, now in its 17th year, is the profession’s best known recognition program for sustainable design excellence. The program celebrates projects that are the result of a thoroughly integrated approach to architecture, natural systems and technology. They make a positive contribution to their communities, improve comfort for building occupants and reduce environmental impacts through strategies such as reuse of existing structures, connection to transit systems, low-impact and regenerative site development, energy and water conservation, use of sustainable or renewable construction materials, and design that improves indoor air quality.”

While we, of course, congratulate all the winners of this important distinction, we are especially excited for the clients of our members, including Leddy Maytum Stacy Architects of San Francisco and Brooks + Scarpa of Los Angeles!

lmsarchitects_merrittcrossingLeddy Maytum Stacy Architects / Merritt Crossing Senior Apartments

“Located at the edge of Oakland’s Chinatown, this new affordable senior housing transforms an abandoned site near a busy freeway into a community asset for disadvantaged or formerly homeless seniors while setting a high standard for sustainable and universal design. The high-density, transit-oriented project is one of the first new developments planned near the Lake Merritt BART regional transit station. The upper floor apartments respond to the character of the eclectic Pan-Asian neighborhood with colorful and varied porous facades that reflect their orientation. The south façade features an independent screen that provides shading, privacy and acoustical modulation while enlivening the view of passing freeway drivers.”

brooksscarpa_yinyanghouseBrooks + Scarpa / Yin Yang House

“This nearly net-zero energy live/work home and office was designed to function not only as a home and commercial office for both parents, but also as a private home for a large and growing family with several children. We sought to create a calm, relaxed and organized environment that emphasizes public space and changes the stereotype of a live/work home for a large family with young kids. Part private home and part business, the house is meant to serve as a place to entertain and a welcoming space for clients and teenagers. It was designed to incorporate sustainable design as a way of teaching a green lifestyle and the offices are purposefully integrated with the home, making both the house and office feel large despite their small combined area. Passive measures, such as a very tight building envelope, reduce energy demand by more than 50 percent. The 12-kW solar system produces 100% of it’s electricity needs.” Continue reading “2013 AIA Top Ten Green Projects List: a/e ProNet Clients Among the Winners!”

pronetworknews_201302The February 2013 issue of ProNetwork News is the first installment of a two-part article; the author, Tim Corbett of SmartRisk explains the origins and principles of project coverage and introduces the reader to two of the four main types of Project Insurance.

Project insurance for design professionals was initially established to provide higher, dedicated limits for larger and more complex projects. The other main driving force behind the development of project coverage was to provide owners the security of having project specific limits both during and after the project was complete. Project insurance has evolved and continues to change based on market needs and conditions, as well as insurance company underwriting standards and “appetite,” or the desire to write certain kinds of risks.

More recently, the collaborative project delivery method sometimes referred to as the integrated delivery (ID) or integrated project delivery (IPD) process has impacted project insurance. In IPD, design professionals are no longer the sole authors of the project design: greater contributions are provided by other entities, including the general contractor and the major trade subcontractors. A few select insurance companies have begun to offer project specific policies tailored to the methods and exposures of IPD.

The key to selecting the correct coverage is theoretically simple: match the benefits of the insurance with the entity or entities requiring the protection. Will one option meet that goal? That’s a very good question: you may need a combination of alternatives to accomplish your insurance and risk management objectives. You should also be aware that even obtaining project insurance has been a challenge in the past, and continues to be so today. Continue reading “Project Insurance: Benefits and Cautions – Part 1 of 2”

architect_brain
Photo via Houzz: The Brain of a Designer, in Diagrams (Coffee with an Architect)

Architecture isn’t brain surgery, but it is a mentally demanding profession that requires input and effort from both sides of the brain. Wouldn’t it be cool to know how an architect’s brain works? Now you can.

Recently, Realty Today posted an article on How an Architect’s Brain Functions:

“While the left brain pays attention to the patterns, measurements it also focuses on meeting deadlines, understanding building and design codes, paying bills , setting appointments and remembering them, “cleaning the refrigerator”, “smelling like vanilla” and going to “sleep at 10 p.m.”(apparently, architects and designers need their sleep).

“The right brain of an architect mainly focuses on the possibilities and potential of a new project and is easily excited by each option that surfaces. However, arriving late at every meeting or appointment, spending $200 on a pen, wearing a scarf in July and leaving sticky notes in the pocket are also some of the activities it controls.”

Explains a lot, right? In fact, I’m pretty sure Mom’s disapproving voice is an area of the brain not unique to architects! Ditto Needs more cowbell.

The illustration above is just one in a series created by architect and artist Jody Brown; as Curbed explained, Brown is “the guy behind architecture-themed Valentine’s Day cards and a simplistic representation of architects’ inner psyches”. See the rest of these cool, quirky, revealing drawings here.

Bonus: Are you right-brained or left-brained? Take the quiz!

scalesWhere does professional liability end and personal liability begin? For design professionals, the line can sometimes be fuzzy, especially with regard to personal injury claims.

Now, Florida’s lawmakers have taken steps to limit liability in for design professionals in these cases.

According to a recent announcement by the legal firm of Smith, Currie & Hancock LLP:

 

“On April 24, 2013 Governor Scott signed Senate Bill 286 into law creating section 558.0035, Florida Statutes. This new law grants individual design professionals employed by a business entity or an agent of the entity immunity from liability for economic damages resulting from negligence occurring within the course and scope of a professional services contract under the following conditions: (a) the contract is made between the business entity and a claimant or another entity for the provision of services to the claimant; (b) the contract does not name an individual employee or agent as a party to the contract; (c) the contract prominently states that an individual employee or agent may not be held individually liable for negligence; (d) the business entity maintains any professional liability insurance required under the contract; and (e) any damages are solely economic in nature and do not extend to persons or property not subject to the contract. The law takes effect on July 1, 2013 and does not state that it is retroactive…

This new law erodes Florida’s common law which has allowed professional negligence claims against an individual design professional based on the professional’s violation of her duty of care to those who may be foreseeably injured. Florida’s common-law imposes a duty of care on all individual professionals that exceeds the duty of care of the general public. Professionals, such as doctors, lawyers, accountants, and design professionals, have always been held to a higher standard of care and associated individual liability for professional negligence. This new law will afford design professionals protections that other professionals do not enjoy.”

For the full, detailed announcement, visit the Smith, Currie & Hancock website.

Shout-Out Credit:

Meade Collinsworth
Collinsworth, Alter, Fowler & French, LLC of Miami Lakes , FL
Email: mcollinsworth@caffllc.com / Phone: 305-822-7800