Tired of reading article after newsletter after white paper after blog post on risk management? (We hope not! But just in case…) Here’s another option:

[youtube https://www.youtube.com/watch?v=C2ioR9X05Qo]

Longtime a/e ProNet affiliate Kent Holland of ConstructionRisk, LLC has translated his impressive catalog of resources into a series of short videos available on the ConstructionRisk.com YouTube Channel.

“If you’re involved in the construction project, whether as a contractor, a designer, or a project owner, you will get real benefit from the practical ideas, suggestions, and law presented in these videos.”

A few of the playlists available now:

J. Kent Holland is a construction lawyer located in Tysons Corner, Virginia, representing design professionals, contractors, and project owners.

Don’t forget the popcorn!

PN - Vol. 21, No.2. 2013 - Building Information Modeling (BIM)Embracing the latest technology can set a design firm apart from the crowd, but it can also set you up for a rough road if you’re not adequately prepared beforehand. Building Information Modeling (BIM) is far from “new” at this point, but some wary design professionals have abstained from it anyway, allowing time to tell whether BIM would be a positive thing for the industry, overall. Good news!

“Building Information Modeling (BIM)… [has] not necessarily opened the door to more claims, as several carriers expected. A few [insurance companies] have found BIM projects to be low-risk; some even went as far as giving discounts to design clients that utilize BIM.” — Engineering, Inc., February 2014

a/e ProNet’s latest ProNet Practice Note, authored by Joseph Barra of Robinson & Cole, can take you from here. The following is an excerpt from Building Information Modeling (BIM): Now that you know how to spell BIM, is it right for you and your firm?

Building Information Modeling (BIM) is the process of developing a virtual, three-dimensional, information rich model to design, construct, and maintain a building project. BIM is much more than software used to produce a pretty 3D graphic. Because a variety of information can be embedded into the model, BIM can also be used to manage the project’s construction schedule (4D); to track project costs (5D); and, once constructed, facility management (6D).

There are varying levels of BIM adoption and use, from an initial pilot project with one player using BIM tools to a team process with agreed-upon collaborative BIM process goals. In ideal process, all project participants share information.

These times are a changin’…

Because BIM is about process and not just software, it gives designers and constructors a unique opportunity to eliminate the barriers to collaborative thinking. One example is found in the redundancies inherent in the shop-drawing process. In this case, the goal of the BIM process is to abolish the wasteful practice of having to draw the entire project twice. Because BIM facilitates teamwork, many see BIM as an opportunity to reach out across disciplines and reconsider the traditional paradigm. Make no mistake, we still need experienced architects, engineers, contractors, and owners to deliver a successful project. But in today’s BIM-enabled world, the process is becoming more collaborative, which in turn redefines the project team’s risk profile.

To continue reading, download the full PDF version of this newsletter, which outlines Factors to Consider before deciding to use BIM (e.g., Type of Project, Timing, Teammates, Project Delivery Method). And if you have additional questions about BIM and/or professional liability insurance, be sure to contact your local a/e ProNet broker today!

seisomogram_eq

In an effort to demystify some of the concepts and to provide a ready reference, a/e ProNet gathered some of its finest insurance minds and put together this list of typical coverages for design professionals. This is not intended to be an exhaustive source of information but rather a primer designed to answer basic questions and to put the reader on the right track if more information is needed. Today, we’ll touch on Earthquake insurance and Flood insurance for Architects and Engineers:

EARTHQUAKE COVERAGE

Earthquake hazards in the United States are commonly associated with Western States and in particular California, however in past history, significant earthquakes have occurred on other states including South Carolina, Missouri, Ohio and Alaska. Because in the mid-states of the US a significant earthquake hasn’t occurred for more than 100 years, people have become very complacent about a reoccurrence. Some experts say it’s not a matter of “if” but “when.” As a result of this casual attitude, a high percentage of real and personal property is not currently insured for this hazard. A further concern is that building structures in these mid-state areas are not constructed to resist earthquake damage such as most new construction in California and other western states are. Keep in mind that loss is not limited to the direct damage to property. Severe earthquake may interrupt public transportation, damage roads and bridges that prevent the movement of private vehicles. Many utilities including electricity, water, fuel gas, and sewage may be interrupted for long periods of time. Every firm would be well served to investigate Earthquake Coverage for their building and contents coverage, even though the risk of loss seems remote.

Most Earthquake coverage is written on a “Difference in Conditions” insurance form, attached to standard property policies. This form originally included a multitude of “All Risk” coverages offered with earthquake added as an insured peril. The evolution of this coverage form has changed the focus to coverage from “All Risks of Loss” to focus on earthquake, Sprinkler Leakage, and Flood and does not include landslide, subsidence or soil movement unless it is caused by Earthquake. Continue reading “Natural Disasters: Earthquake and Flood Protection for Architects & Engineers”

gavelCalifornia architects can breathe a little easier. Filed June 3, 2013, the Court of Appeals decision in Brisbane Lodging, LP v. Webcor Builders, Inc. held that the section 13.7.1.1 of the 1997 AIA Standard Form of Agreement between Owner and Contractor is enforceable.

This is good news for Design Professionals, as section 13.7.1.1 shortens the statute of limitations period to four years and effectively abrogates the delayed discovery rule in California.

Per an announcement email recently received from Jacqueline Pons-Bunney, a partner at law firm Weil & Drage:

The case involves a contract between an owner and a contractor for the construction of a hotel. The clause at issue reads:

“any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion.”

Substantial completion at the subject project was July 31, 2000. In early 2005, the owner discovered a break in the sewer line which caused waste to flow under the hotel. It was determined that the plumbing problem was a latent defect. Both the contractor and its plumbing subcontractor investigated the problem and attempted repairs. It was ultimately discovered that the plumbing subcontractor had installed ABS pipe rather than cast iron pipe for the sewer line, in violation of the Uniform Plumbing Code. The owner filed a lawsuit in May 2008. Continue reading “California Court Upholds Contractual Statute of Limitations Provision in AIA Standard Form”

structuralUsing a real-life claims scenario from “a structural engineer and senior partner in a small A/E firm that specialized in multi-family and commercial condominium projects”, William F. Dexter offers his view on the Top 3 Liabilities Facing Design Professionals in today’s increasingly litigious marketplace:

“Long after the construction documents have been published and permits issued, the architect or engineer flies into the Bermuda Triangle of construction phase services, which include review of shop drawings, payment certification and construction observation.   Let’s take a look at establishing solid guidelines to reduce the risks of these frequent situations by transferring liability back to the client and others who are always quite eager to let the design professional be responsible.”

Continue reading at the JDI Data website.

pronet_rmcrgAt its most basic level, risk management for design firms includes selecting and signing sound contracts. a/e ProNet’s  Risk Management & Contract Guide for Design Professionals (2005) can assist with the specifics of this process.

An excerpt from Chapter 7, Some Do’s and Don’ts of Contract Language:

7.2 Words to Avoid

Certain words create the impression that the design firm has a greater duty or responsibility than required by the generally accepted standard of care and scope of services stated elsewhere in the contract. Some words that risk managers often advise the design firm to avoid using in their contracts to the greatest extent possible include the following:

  • “supervise contractor’s work”
  • “control contractor’s work”
  • “direct contractor’s work”
  • “guarantee or warrant either your services or the contractor’s work”
  • “certify that contractor’s work meets the plans and specifications”
  • “inspect contractor’s work to assure it meets the plans and specifications”

This risk management guide was previously out of print, but has since been re-released in electronic format. The book includes three updated optional AIA-approved continuing education courses! Visit the a/e ProNet Web Store to purchase and download your copy today! Also available is our most recent guide, Risk Management for Design Professionals in a World of Change (2009). If you have any questions about these resources, find your local a/e ProNet broker or Contact Us.

ProNetworkNews_2013MarchThe March 2013 issue of ProNetwork News is the second installment of a two-part article; the author, Tim Corbett of SmartRisk explains the origins and principles of project coverage and introduces the reader to two of the four main types of Project Insurance. For a recap of the first part, including details about types 1 (Project Professional Liability Insurance) and 2 (IPD Project Specific Insurance), download the full March issue, or, better yet, download the February 2013 newsletter here.

Now, let’s examine the remaining three types of project coverage.

3. Project Specific Insurance Limits

Sometimes, contracts demand that design professionals carry a higher limit than they usually do. This can occur on any kind of project, but is more common on larger, higher risk projects, and more recently, on public ones. One of the more common strategies for obtaining increased limits for a project is through a Project Specific Insurance Limit. This is provided by endorsement through your current practice policy insurance carrier.

Benefits and typical features of Project Specific Insurance Limits:

  • Provides a higher limit for the firm, for a specific project only.
  • Can be more cost effective than raising the limits on the entire practice policy.
  • Makes the cost of the project-specific limit a reimbursable expense.

Cautionary Points and Tactics:

Having a project specific increased limit may not always be the best strategy, and it may not even be available from your practice policy carrier. From an insurance company’s perspective, comparing construction costs to policy limits is part of the underwriting process. Construction value and requested limits may not be in line with the insurer’s potential exposure: those higher limits requested could place a target on the design firm’s back. The insurer doesn’t want to provide the higher limits that could be used as a cost recovery strategy.

  • Ensure that requested limits are in line with exposures and construction costs. For example, is it necessary to require a $5 million limit of professional liability insurance from a firm performing services on a $20 million project?
  • Contact the contract administrator, and state that your firm normally carries a lower professional liability limit than requested, and that it is consistent with industry practice. Inquire if your current limit will be acceptable.

* Include language similar to the following in your contract:

“The expense of any additional insurance coverage or limits requested by the Owner in excess of that normally carried by the firm shall be a reimbursable expense paid by the Owner.”

To find out more about types 4 (The Wrap-Up Policy) and 5 (Owner Protective Insurance Policy or OPIP), download the full March 2013 issue from our website.

About the Author: Timothy (Tim) Corbett is Founder and President of SmartRisk, a Pasadena, CA based consultancy with over 25 years of experience providing risk management and performance management solutions to Design and Building Professionals. Mr. Corbett holds a BS Degree in Security & Risk Management, MS Degree in Management; a degree in Environmental studies as well as concentrated studies in Architecture Design and is LEED accredited. For more information on this or other topics, visit the SmartRisk website or email Tim at tcorbett@smartrisk.biz.

Photo via Victor O. Schinnerer's War Stories: Budget Buster
Photo via Victor O. Schinnerer’s War Stories: Budget Buster

I shouldn’t need to buy  insurance! I’ve never had a claim.

This is a common refrain from architects and engineers purchasing professional liability insurance for the first time. We hear you. There are lots of design professionals who feel this way. That’s why it’s important to recognize that insurance isn’t about punishing you for past claims; it’s about protecting you from future claims. Contractual insurance requirements aren’t merely expensive obstacles to bidding for a job; they’re supposed to protect the individual parties from the far more expensive burden of an uninsured professional liability claim. And, like it or not, industries like Architecture and Engineering are rife with potential claims.

Oh yeah? Like what?

Don’t just take our word for it. Check out this library of War Stories and Claims Scenarios from Architects, Engineers, Surveyors & Consultants, an excellent resource offered by Victor O. Schinnerer, one of the leading Professional Liability insurance companies. These are real life claims stories. Here you can read through scenarios which happened to other firms, often in spite of their best efforts to avoid such things! While the names have been changed, details are included. In each case, you’ll find out what the mistake was. How it was made. How much it ultimately cost. How it could have been avoided.

A couple of examples from the War Stories library:

Budget Buster

ABC Engineers provided design services for a residential project. The owner obtained a construction loan from a bank for $2.7 million; believing he could obtain additional funds from the bank if needed. As construction progressed, they expended the $2.7 million budget before the project was complete. The bank believed $2.7 million was adequate to complete the project and denied the owner’s request for an additional $1.3 million. The owner could not obtain additional funds and the contractors stopped working, leaving the project incomplete. Read more at Schinnerer’s website…

Due Diligence is Due

Gerard Coins Architecture, a sole proprietor, was retained by a housing authority to provide architectural design for Blanket Apartments, a low income housing development. Gerard Coins Architecture also provided mechanical design, which was permitted by state law. The architect’s design called for standard, 30 gallon water heaters but the owner wanted electric, tankless water heaters instead. The architect checked with a supplier and based on verbal information, sized the water heaters for the apartment units.

After the apartments were built, it was discovered that the water heaters did not supply enough hot water. The architect contacted the water heater manufacturer who told him the water heaters were intended to be used at a source, such as a sink or bathtub—not to heat the water for an entire apartment. Read more at Schinnerer’s website…

Risky Inspection

Homer Watkins Engineering, a civil engineering firm, was retained to provide a limited inspection and design report for a historic building. Several years later, they provided an inspection report for the sale of the same building.

A painting contractor employee, who was working on the historic building, fell three stories sustaining serious injuries after the railing collapsed on a balcony he leaned against. The painting contractor employee filed suit claiming he was permanently, partially disabled and disfigured. After filing suit against a number of parties, Homer Watkins Engineering’s inspection report was found during discovery and the suit was amended to add them.

The painting contractor employee contended that while Homer Watkins Engineering’s inspection report put the new owner on notice that the railing was too low and posed a safety hazard, it did not go far enough in warning the owner that it should be fixed immediately. While it was felt the height of the railing had nothing to do with the fall, the defense counsel felt the inspection report should have been more detailed as it was dealing with a very old brick and wood building that may have had weaknesses requiring more investigation. Read more at Schinnerer’s website…

Protect yourself and your firm from situations like these by purchasing a Professional Liability policy tailored to the specific needs of design professionals. Our members are specialists in this field, so find and contact your local a/e ProNet broker today.

scalesWhere does professional liability end and personal liability begin? For design professionals, the line can sometimes be fuzzy, especially with regard to personal injury claims.

Now, Florida’s lawmakers have taken steps to limit liability in for design professionals in these cases.

According to a recent announcement by the legal firm of Smith, Currie & Hancock LLP:

 

“On April 24, 2013 Governor Scott signed Senate Bill 286 into law creating section 558.0035, Florida Statutes. This new law grants individual design professionals employed by a business entity or an agent of the entity immunity from liability for economic damages resulting from negligence occurring within the course and scope of a professional services contract under the following conditions: (a) the contract is made between the business entity and a claimant or another entity for the provision of services to the claimant; (b) the contract does not name an individual employee or agent as a party to the contract; (c) the contract prominently states that an individual employee or agent may not be held individually liable for negligence; (d) the business entity maintains any professional liability insurance required under the contract; and (e) any damages are solely economic in nature and do not extend to persons or property not subject to the contract. The law takes effect on July 1, 2013 and does not state that it is retroactive…

This new law erodes Florida’s common law which has allowed professional negligence claims against an individual design professional based on the professional’s violation of her duty of care to those who may be foreseeably injured. Florida’s common-law imposes a duty of care on all individual professionals that exceeds the duty of care of the general public. Professionals, such as doctors, lawyers, accountants, and design professionals, have always been held to a higher standard of care and associated individual liability for professional negligence. This new law will afford design professionals protections that other professionals do not enjoy.”

For the full, detailed announcement, visit the Smith, Currie & Hancock website.

Shout-Out Credit:

Meade Collinsworth
Collinsworth, Alter, Fowler & French, LLC of Miami Lakes , FL
Email: mcollinsworth@caffllc.com / Phone: 305-822-7800