Looking for a convenient way to fulfilll your AIA Continuing Education credit requirements? a/e ProNet can help.

In the past few years, a/e ProNet has published two risk management guides for the design industry: Risk Management & Contract Guide for Design Professionals and Risk Management for Design Professionals in a World of Change. Both include courses at the back of the book, which have just been renewed with the AIA for credit for an additional 3 years.

Our books and access to the courses are available for purchase on our website, but you can receive a discount for both by requesting copies from your a/e ProNet broker. (And if your broker isn’t an a/e ProNet member, call your local a/e ProNet broker today!)

Read on for details about both contract review guides… Continue reading “Need CE Credits? a/e ProNet’s Contract Review Guides Can Help”

ProNetworkNews_2013AprilIn•dem•ni•fy Verb.

• Compensate (someone) for harm or loss.
• Secure (someone) against legal responsibility for their actions.

Imagine a case where an engineering firm was found to have had an expensive duty to defend claims asserted against a developer, even after the engineer’s performance was judged not to have violated the professional standard of care. That was the decision three years ago, in the California Court of Appeals in UDC – Universal Development L.P. v. CH2M Hill. In fact, that case extended another one, decided two years earlier in the California State Supreme Court. (Crawford v. Weather Shield Mfg., Inc.). That decision held that the duty to defend was incurred the moment that the indemnitee (the party that the design firm was contractually bound to indemnify) tendered its defense to the design firm.

Candidly, the indemnity provision underlying the UDC v. CH2M Hill decision was long and rambling, repetitive, and ambiguous. That’s what opened the door to the expansive (and expensive) legal interpretation. The clear message to design professionals was: if you do not want to take on the extensive defense and indemnity obligations implied or required by statute and case law, you must be clear. Further, the longer and more confusing an indemnity provision is, the more likely it is to receive an expansive reading.

The point of this article is to provide design professionals with a simple, three-step evaluation and corresponding “scoring” model to evaluate and improve the indemnity obligations it receives. Continue reading “Making the Grade: Testing Design Professional Indemnity Obligations”

gavelCalifornia architects can breathe a little easier. Filed June 3, 2013, the Court of Appeals decision in Brisbane Lodging, LP v. Webcor Builders, Inc. held that the section 13.7.1.1 of the 1997 AIA Standard Form of Agreement between Owner and Contractor is enforceable.

This is good news for Design Professionals, as section 13.7.1.1 shortens the statute of limitations period to four years and effectively abrogates the delayed discovery rule in California.

Per an announcement email recently received from Jacqueline Pons-Bunney, a partner at law firm Weil & Drage:

The case involves a contract between an owner and a contractor for the construction of a hotel. The clause at issue reads:

“any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion.”

Substantial completion at the subject project was July 31, 2000. In early 2005, the owner discovered a break in the sewer line which caused waste to flow under the hotel. It was determined that the plumbing problem was a latent defect. Both the contractor and its plumbing subcontractor investigated the problem and attempted repairs. It was ultimately discovered that the plumbing subcontractor had installed ABS pipe rather than cast iron pipe for the sewer line, in violation of the Uniform Plumbing Code. The owner filed a lawsuit in May 2008. Continue reading “California Court Upholds Contractual Statute of Limitations Provision in AIA Standard Form”

ooh_moon

Now that we have grabbed your undivided attention, the purpose of this article is to alert Design Professionals to an alarming trend. This trend involves the inclusion of contract provisions in agreements prepared by Owners/Developers and their attorneys that force a Design Professional to work for free in the event that the Owner/Developer unilaterally determines that there is a “dispute.”

Overview

It goes without saying that every contract, especially in the design field, must be read thoroughly before it is signed, or the signer will be stuck with the ramifications. Generally speaking, the clauses in question here state that in the event of any dispute between the Owner/Developer and Design Professional, the Owner/Developer may withhold payment until the dispute is resolved, but the Design Professional must continue to perform services. This upsets the historical balance of power between the Owner/Developer and the Design Professional and creates a situation where the Design Professional may very well end up working for free or else be faced with being sued if they stop work or suspend services. Continue reading “How to Get a Design Professional to Work For Free!”

Photo via Victor O. Schinnerer's War Stories: Budget Buster
Photo via Victor O. Schinnerer’s War Stories: Budget Buster

I shouldn’t need to buy  insurance! I’ve never had a claim.

This is a common refrain from architects and engineers purchasing professional liability insurance for the first time. We hear you. There are lots of design professionals who feel this way. That’s why it’s important to recognize that insurance isn’t about punishing you for past claims; it’s about protecting you from future claims. Contractual insurance requirements aren’t merely expensive obstacles to bidding for a job; they’re supposed to protect the individual parties from the far more expensive burden of an uninsured professional liability claim. And, like it or not, industries like Architecture and Engineering are rife with potential claims.

Oh yeah? Like what?

Don’t just take our word for it. Check out this library of War Stories and Claims Scenarios from Architects, Engineers, Surveyors & Consultants, an excellent resource offered by Victor O. Schinnerer, one of the leading Professional Liability insurance companies. These are real life claims stories. Here you can read through scenarios which happened to other firms, often in spite of their best efforts to avoid such things! While the names have been changed, details are included. In each case, you’ll find out what the mistake was. How it was made. How much it ultimately cost. How it could have been avoided.

A couple of examples from the War Stories library:

Budget Buster

ABC Engineers provided design services for a residential project. The owner obtained a construction loan from a bank for $2.7 million; believing he could obtain additional funds from the bank if needed. As construction progressed, they expended the $2.7 million budget before the project was complete. The bank believed $2.7 million was adequate to complete the project and denied the owner’s request for an additional $1.3 million. The owner could not obtain additional funds and the contractors stopped working, leaving the project incomplete. Read more at Schinnerer’s website…

Due Diligence is Due

Gerard Coins Architecture, a sole proprietor, was retained by a housing authority to provide architectural design for Blanket Apartments, a low income housing development. Gerard Coins Architecture also provided mechanical design, which was permitted by state law. The architect’s design called for standard, 30 gallon water heaters but the owner wanted electric, tankless water heaters instead. The architect checked with a supplier and based on verbal information, sized the water heaters for the apartment units.

After the apartments were built, it was discovered that the water heaters did not supply enough hot water. The architect contacted the water heater manufacturer who told him the water heaters were intended to be used at a source, such as a sink or bathtub—not to heat the water for an entire apartment. Read more at Schinnerer’s website…

Risky Inspection

Homer Watkins Engineering, a civil engineering firm, was retained to provide a limited inspection and design report for a historic building. Several years later, they provided an inspection report for the sale of the same building.

A painting contractor employee, who was working on the historic building, fell three stories sustaining serious injuries after the railing collapsed on a balcony he leaned against. The painting contractor employee filed suit claiming he was permanently, partially disabled and disfigured. After filing suit against a number of parties, Homer Watkins Engineering’s inspection report was found during discovery and the suit was amended to add them.

The painting contractor employee contended that while Homer Watkins Engineering’s inspection report put the new owner on notice that the railing was too low and posed a safety hazard, it did not go far enough in warning the owner that it should be fixed immediately. While it was felt the height of the railing had nothing to do with the fall, the defense counsel felt the inspection report should have been more detailed as it was dealing with a very old brick and wood building that may have had weaknesses requiring more investigation. Read more at Schinnerer’s website…

Protect yourself and your firm from situations like these by purchasing a Professional Liability policy tailored to the specific needs of design professionals. Our members are specialists in this field, so find and contact your local a/e ProNet broker today.

scalesWhere does professional liability end and personal liability begin? For design professionals, the line can sometimes be fuzzy, especially with regard to personal injury claims.

Now, Florida’s lawmakers have taken steps to limit liability in for design professionals in these cases.

According to a recent announcement by the legal firm of Smith, Currie & Hancock LLP:

 

“On April 24, 2013 Governor Scott signed Senate Bill 286 into law creating section 558.0035, Florida Statutes. This new law grants individual design professionals employed by a business entity or an agent of the entity immunity from liability for economic damages resulting from negligence occurring within the course and scope of a professional services contract under the following conditions: (a) the contract is made between the business entity and a claimant or another entity for the provision of services to the claimant; (b) the contract does not name an individual employee or agent as a party to the contract; (c) the contract prominently states that an individual employee or agent may not be held individually liable for negligence; (d) the business entity maintains any professional liability insurance required under the contract; and (e) any damages are solely economic in nature and do not extend to persons or property not subject to the contract. The law takes effect on July 1, 2013 and does not state that it is retroactive…

This new law erodes Florida’s common law which has allowed professional negligence claims against an individual design professional based on the professional’s violation of her duty of care to those who may be foreseeably injured. Florida’s common-law imposes a duty of care on all individual professionals that exceeds the duty of care of the general public. Professionals, such as doctors, lawyers, accountants, and design professionals, have always been held to a higher standard of care and associated individual liability for professional negligence. This new law will afford design professionals protections that other professionals do not enjoy.”

For the full, detailed announcement, visit the Smith, Currie & Hancock website.

Shout-Out Credit:

Meade Collinsworth
Collinsworth, Alter, Fowler & French, LLC of Miami Lakes , FL
Email: mcollinsworth@caffllc.com / Phone: 305-822-7800

One of the many value added resources a/e ProNet brokers offer is access to our ProNet Practice Notes, in-depth white papers prepared by members of a wide variety of professions related to the design industry. They offer insight and advice on topics like risk management, practice management, and litigation issues for Architects, Engineers, and other Design Professionals.

ProNetPracticeNotes_Header

Our most recent edition is titled  The Collections-Claim Connection: Getting Paid Without Getting Sued, authored by attorney David A. Ericksen of Severson & Werson in San Francisco, CA. The full PDF version of this excellent paper, including several helpful attachments, is available for download at our website. The following is an excerpt for your review. We hope you find it helpful!

Introduction

While money isn’t everything, it is the measure and fuel of any business, including a design firm. Without payment for services firms suffer, starve, and even die. Payment issues are also often the single greatest warning sign of a project in trouble.

Perhaps there is no greater indicator of the correlation between unpaid fees and troubled projects and relationships than the remarkable frequency with which efforts of design professionals to collect unpaid fees through litigation result in even larger responsive counter-claims from clients alleging professional negligence. 2011 gave the entire industry the most dramatic and alarming example of this pattern. Having already received over $8.2M in fees, the engineering firm Carter & Burgess sued its client the City of Victorville in Southern California for the final $106,196 on a power plant project that the City had been forced to partially abandon mid-project due to cost overruns. The City responded with a counter-claim for professional negligence. When the verdict came in 2011, it was devastating financially and professionally as news, industry, and internet sources widely reported and publicized the award of $52.1M in damages against the engineering firm.

The results of such a counter-claim need not be as dramatic in terms of publicity or financial losses to be devastating to the firm. In addition to the unpaid fees, there are many other impacts of even a “defensive” counter-claim. They frequently include:

  • Deductible payments for legal fees and costs, which may even include the involvement of a second “defense” attorney.
  • Insurance impacts for rating, pricing, and loss history.
  • Lost internal time and resources for purposes of participation in defense.
  • Publicity and required disclosures in future responses to RFPs for claims history.
  • Potential uninsured exposure for prevailing party attorneys’ fees if negligence claims exceed fee claims.
  • Ultimate discounted or waived fees for expediency of resolving and closing claim.

Obviously, avoiding such collection challenges and the potential for responsive claims is critical to good business and project success.

In reality, a proper approach to collections closely resembles a proper regimen for personal health. Firms which get paid become and remain healthy and strong. Firms which do not get paid regularly and on time become malnourished and increasingly susceptible to disease. Just as health is a life-long process, financial success is a project-long process. The following discussion tracks the relevant phases and provides analyses and strategies for those various phases. Those phases are: Continue reading “{ProNet Practice Note} The Collections-Claim Connection: Getting Paid Without Getting Sued”

Shootout At The Copyright Corral

pronetworknews_dec2012Copyright: The Unused Weapon

It is no secret that in the current economic environment, it can be difficult to find projects, and the problem may not end there. It can be even more difficult to secure prompt payment from your client. Sometimes, it is difficult to secure payment at all.

There are certain statutory protections for architects in many states: design professionals’ liens for certain projects and mechanics’ liens for others. But like other legal remedies, statutory protections require timely legal action, and the legal fight can be both financially and personally arduous.

Most of the time, architects and other design professionals have one potential weapon in their arsenals that no one else on the project can bring to the unpaid fees fight: the ability to control the use of their work product through copyright protection. As long as the work product meets certain statutory requirements and their rights are not otherwise waived, design professionals own a copyright by authorship alone. Additionally, registering the copyright with the U.S. Copyright Office entitles the copyright owner to additional statutory damages and attorneys’ fees in any ensuing infringement action.

Copyright is an underutilized tactic in the fee collection “gun fight.” On a project where construction had been in full progress but is stalled because no one – design professionals, project manager, general, and subcontractors – has been paid by the owner, the standard litigation tactic is to sue for breach of contract and file an action for foreclosure on any lien rights. But what if the owner is also in default on its construction loan? Continue reading “Shootout At The Copyright Corral”

With more project owners demanding the use of Building Information Modeling (BIM), project delivery is necessarily carried out through greater contributions of design input by the general contractor and the major trade subcontractors. The design professionals are no longer the sole authors of the project design. This collaborative project delivery method has been called integrated project delivery (IPD). The contribution of design input from each of the various project players using IPD is a significant break from the traditional division of responsibility recognized in the standard design-bid-build project delivery method. Players who never participated in the project design now face potential risk of professional liability. Additionally, the new, cutting-edge technologies being used for BIM expand the types of risks born by the design professional if there are errors and omissions within the computer modeling system or the improper management of the computerized data.

What is BIM?

BIM involves computerized design software tools that help create a model that reflects all of the building components’ geometric and functional qualities. The general contractor and trade subcontractors provide product-specific information for building components and that data is inputted into the model, including performance specifications, connection details and cost data. However, the model is more than a mere representation of the design in a three-dimensional computer graphic. Embedded within the design programs are rules that define each of the components’ relation to the other components. Continue reading “Integrated Project Delivery: Changing the Insurance Landscape”