When it comes to the world of construction contracts, there is no one-size-fits-all solution regarding insurance. The Design Professional’s insurance policies cannot and should not anticipate the needs and risks of a General Contractor, for example. This comes up all the time at the beginning of contract negotiations. You can sidestep disputes further down the road if you understand the way your insurance policy and carrier will respond in the event of a claim. Here are a few Frequently Asked Questions:

The General Contractor has requested to be named as an “Additional Insured” on my professional liability policy. Can I accommodate this request?

It is not a good idea to name the contractor as an additional insured in the sub-consultants design E&O policy. The principal reason involves the “insured vs insured” exclusion found in virtually all design E&O policies. If the contractor believes he has a cause of action against his sub-consultant design firm, this exclusion will eliminate coverage for both the contractor and the design firm.

How can the General Contractor protect themselves?

The General Contractor may purchase “Contractor’s Professional Liability insurance.” This will protect the General Contractor from vicarious liability claims from third parties and also solves the problem of the “Insured vs.Insured” exclusion that would apply if the contractor would bring an action against the sub-consultant design firm, when named as an additional insured. Another benefit is a separate set of insurance limits. The General Contractor would have their own set of insurance limits that would not be subject to dilution or reduction from other claimants against the design professional’s errors & omissions policy covering their general practice.

Why would the General Contractor need Professional Liability coverage?

The General Contractor has the same “Vicarious Liability” for the negligent acts, errors or omissions of their professional sub-consultants as they do for the non-professional subcontractors. The General Contractor cannot rely solely on the hold harmless indemnity clause in the contract document. The hold harmless may not be enforceable in certain jurisdictions because of the language of the indemnity clause. The Sub-Consultant may not have sufficient insurance or their policy limits may be reduced or exhausted from other claims. The policies may be cancelled by the carrier giving notice or for non-payment of premiums. The General Contractor is then left with a false sense of security if they rely on the general liability insurance of the sub-consultant, which excludes professional design activities and responsibilities.

If you had more questions about this common issue, call your local a/e ProNet broker.

With more project owners demanding the use of Building Information Modeling (BIM), project delivery is necessarily carried out through greater contributions of design input by the general contractor and the major trade subcontractors. The design professionals are no longer the sole authors of the project design. This collaborative project delivery method has been called integrated project delivery (IPD). The contribution of design input from each of the various project players using IPD is a significant break from the traditional division of responsibility recognized in the standard design-bid-build project delivery method. Players who never participated in the project design now face potential risk of professional liability. Additionally, the new, cutting-edge technologies being used for BIM expand the types of risks born by the design professional if there are errors and omissions within the computer modeling system or the improper management of the computerized data.

What is BIM?

BIM involves computerized design software tools that help create a model that reflects all of the building components’ geometric and functional qualities. The general contractor and trade subcontractors provide product-specific information for building components and that data is inputted into the model, including performance specifications, connection details and cost data. However, the model is more than a mere representation of the design in a three-dimensional computer graphic. Embedded within the design programs are rules that define each of the components’ relation to the other components. Continue reading “Integrated Project Delivery: Changing the Insurance Landscape”